Offices, shops, homes and buildings, in and around Brussels. The name stays between us.
01A business building in Woluwe
The need: equip everything in a single project, from the entrance to reception.
Installed: cameras, alarm, fire detection, badge readers, video intercom and background music.
What it changes: five systems, one project, one team to call, the same one as for IT.
Access control →02Business premises in Ixelles
The need: be alerted to a fire or a water leak when the premises are closed.
Installed: an alarm, cameras, and fire and water leak detection on the same control panel.
What it changes: the alert reaches the phone, in the evening and at weekends.
Fire and water leaks →03Two pharmacies in Anderlecht
The need: be able to review an incident at the counter and prove it.
Installed: cameras in each pharmacy.
What it changes: clear footage on the phone, easy to export for the police.
CCTV cameras →04A co-ownership in Molenbeek
The need: a recorder at the end of its life and common areas that were no longer being filmed.
Installed: a new recorder and two more cameras.
What it changes: the entrance and common areas are covered again.
Buildings and co-ownerships →05Premises in Soignies
The need: equip all the premises in a single project, outside Brussels.
Installed: cameras, intruder and fire alarms, access control and background music.
What it changes: a single point of contact for five systems.
The intruder alarm →06Old wired alarms in Brussels
The need: alarms installed years ago, with no app, in business premises.
Installed: a new control panel on the existing cabling, checked room by room during the visit.
What it changes: the alarm is set from the phone, without ripping everything out or drilling the walls again.
Upgrading an alarm →07A Brussels building, with its managing agent
The need: a simple entrance for all the flats, and a door that opens without going downstairs.
Installed: a clear street panel and a handset in every flat.
What it changes: the file was prepared with the managing agent for the general meeting.
Door and video intercoms →08A new three-storey building (in progress)
The need: plan everything before the suspended ceilings are closed, with the architect and the electrician, and follow the fire brigade’s report.
Planned: 17 cameras, an alarm, 15 fire detectors and 5 manual call points, 2 badge readers, 4 intercom screens, 16 speakers and 6 screens.
Where we are: the plans are done, and the electrician has received our cabling guide.